Geometry
Width and strip or panel height together. A family photo is not that measurement.
BUYER SUPPORT / FIRST ORDER
Compare factory quotes on the same PVC curtain line
FREE review of product, quantity, destination and sourcing requirements
Eligible first orders may receive up to 3%
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements. Final figures depend on supplier confirmation, product type and order value. This is not a discount, lowest-price, or today-only offer.
Use this page to decide what must be checked on a pvc strip door sample before it is approved, and which temperature or ASTM or food-contact point becomes an acceptance condition. The layout is a decision roadmap. It is not a carbon or ESG story.
Record the factory line, lot mark and the request axes the sample is supposed to match.
Thickness in inches or millimetres, strip width, hanging height and overlap as it will be invoiced.
Attach the named ASTM method or food-contact document if that was an acceptance condition.
Keep the approved piece so a later production lot can be compared on the same axes.
Width and strip or panel height together. A family photo is not that measurement.
If the doorway is a freezer, the compound name on the sample must match the priced line.
ASTM or FDA 21 CFR 177 files name the grade and lot. A plant ISO 9001 letter does not replace them.
If rails or hooks were on the request, the sample set should show the same finish or state the exclusion.
Dimensional page, lot test, packing and Incoterms. Origin of melt or finishing when the receiving plant will ask.
Opening size, traffic, temperature, and whether a food-contact or REACH SVHC file is actually filed.
Same-basis list and a written substitution when the exact pvc strip door item is unavailable. No private grade book.
Write the invoice description, the inquiry form it mapped to, thickness, width, overlap, the temperature or ASTM or food-contact condition, quantity unit, and the date the factory said it can ship the production lot. Two lots that answer that list can be compared. A lot that answers three of the items is not yet a competitor.
Limitation: colour, clarity and rib pattern can drift between calendering runs. If the receiving plant treats those as acceptance items, say so on the retain tag. This desk will not convert a visual preference into a published Shore A or tensile figure.
Send the sample / production split, destination and the files that must travel with the lot.
Request Factory Quotes